For more information regarding the value of a property, please contact us for a free consultation.
Key Details
Sold Price $234,900
Property Type Single Family Home
Sub Type Single Family Residence
Listing Status Sold
Purchase Type For Sale
Square Footage 1,120 sqft
Price per Sqft $209
Subdivision Manchester View 6Th Add
MLS Listing ID 4419244
Sold Date 12/01/22
Style Ranch
Bedrooms 3
Full Baths 2
HOA Y/N No
Abv Grd Liv Area 1,120
Year Built 1968
Annual Tax Amount $3,660
Lot Size 0.826 Acres
Acres 0.8264
Property Sub-Type Single Family Residence
Property Description
Get ready to enjoy single-story living in this New Franklin ranch in a fantastic location! Situated on just under an acre on a corner lot, this ranch home is a rare find with an attached 2 car garage and an additional 2 car detached garage at the rear of the property. After entering the front door into the living room, the kitchen and dining area are straight ahead; this area features LED can lights and new flooring throughout. The kitchen has been updated with tile backsplash and stainless appliances. Off of the main dining area is a large bedroom. Down the hallway is the main bathroom, fully updated with new flooring, tub, and tile surround, and another bedroom. The master bedroom is at the end of the hall and is a major asset to this home, with a walk in closet and completely updated master bath - including a double sink vanity with granite top, shower with tiled surround, canned lighting, and first floor washer/dryer hookups. The basement is clean with high ceilings - plenty of roo
Location
State OH
County Summit
Rooms
Basement Full
Main Level Bedrooms 3
Interior
Heating Forced Air, Gas
Cooling Central Air
Fireplace No
Appliance Dishwasher, Microwave, Range, Refrigerator
Exterior
Parking Features Attached, Detached, Electricity, Garage, Garage Door Opener, Paved
Garage Spaces 4.0
Garage Description 4.0
Fence Chain Link
Water Access Desc Well
Roof Type Asphalt,Fiberglass
Porch Deck, Enclosed, Patio, Porch
Building
Lot Description Corner Lot
Entry Level One
Sewer Septic Tank
Water Well
Architectural Style Ranch
Level or Stories One
Schools
School District Manchester Lsd Summit- 7706
Others
Tax ID 2301583
Financing Conventional
Read Less Info
Want to know what your home might be worth? Contact us for a FREE valuation!

Our team is ready to help you sell your home for the highest possible price ASAP
Bought with Ryan Shaffer • EXP Realty, LLC.